MARIST COLLEGE

GT Ultimate and Pinnacle are the perfect duo for an upgrade to Marist College.

  • Date: January 2024
  • Distributor: Aluform
  • Products: GT Ultimate + Pinnacle

ABOUT THE PROJECT

Built by Construction Control and installed by Parliament Constructions, Marist College Canberra has expanded, now boasting new facilities with wide-ranging applications, from music rooms to theatres and more classrooms. To facilitate an optimal learning environment, the Pinnacle ceiling tile was chosen, along with the GT Ultimate demountable grid system – making for high-performance, acoustically comfortable spaces throughout the newly constructed buildings.

GT ULTIMATE™

GT Ultimate is the first of its kind – a demountable exposed grid system! The cross tee tabs locate into place with a positive audible “snap”, and once installed can be simply removed by pushing the side of the tab and pulling outwards.

The brilliance of this system is that it allows easy access to critical above-ceiling services post-installation – simple! It also enables easy replacement if one cross tee is damaged – saving costs by eliminating the need to re-install the whole ceiling.

RELATED PROJECTS

Rows of desks in an office space, with an acoustic ceiling and glazed partitions.

GOVT DEPT

A pristine, high-level fitout for a government department in Belconnen, ACT.
Etihad Football Academy at Casey Fields, external photo.

EFA

The new Etihad Football Academy at Casey Fields, featuring the Apex.
An empty office space ready for rent, with an acoustic ceiling and Apex ceiling tiles.

1 TAUBMAN

A new-built, ready for lease, commercial building in Canberra, featuring the Apex.